<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>ScheduleLens Blog</title><description>Practical guides on construction scheduling, delay analysis, EOT claims, and programme review.</description><link>https://schedulelens.com/</link><language>en-gb</language><item><title>Schedule Performance Index (SPI): What It Measures and When It Misleads</title><link>https://schedulelens.com/blog/schedule-performance-index/</link><guid isPermaLink="true">https://schedulelens.com/blog/schedule-performance-index/</guid><description>What the schedule performance index measures, why it reads 1.0 at completion even on a late job, and when to read SPIt and required pace in its place.</description><pubDate>Wed, 28 Oct 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>S-Curve in Construction: How to Read Planned, Actual and Earned Progress</title><link>https://schedulelens.com/blog/s-curve-in-construction/</link><guid isPermaLink="true">https://schedulelens.com/blog/s-curve-in-construction/</guid><description>What a construction S-curve shows, how to read its planned, actual and earned curves, and why a healthy-looking curve still needs a critical path check.</description><pubDate>Tue, 27 Oct 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Security of Payment Act: What Construction Payment Claims Need to Show</title><link>https://schedulelens.com/blog/security-of-payment-act/</link><guid isPermaLink="true">https://schedulelens.com/blog/security-of-payment-act/</guid><description>How Australia&apos;s Security of Payment Acts handle payment claims, payment schedules and adjudication, and the programme evidence that makes a claim testable.</description><pubDate>Mon, 19 Oct 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Construction Scheduling Specification: What an Owner Should Write into the Contract</title><link>https://schedulelens.com/blog/construction-scheduling-specification/</link><guid isPermaLink="true">https://schedulelens.com/blog/construction-scheduling-specification/</guid><description>A practical construction scheduling specification checklist for owners: native files, update narratives, acceptance thresholds, float and as-built records.</description><pubDate>Sun, 18 Oct 2026 00:00:00 GMT</pubDate><category>How-To</category><author>ScheduleLens</author></item><item><title>NEC4 Clause 31.2: Programme Requirements, NEC3 Differences and the Amendment Trap</title><link>https://schedulelens.com/blog/nec4-programme-clause-31-2/</link><guid isPermaLink="true">https://schedulelens.com/blog/nec4-programme-clause-31-2/</guid><description>NEC4 clause 31.2 explained: programme content, NEC3 differences, deemed acceptance, and the NEC4 amendment schedule trap for ECC programme reviewers now.</description><pubDate>Mon, 12 Oct 2026 00:00:00 GMT</pubDate><category>Guide</category><author>ScheduleLens</author></item><item><title>What Is an MPP File? What It Stores and How It Differs from Project XML and XER</title><link>https://schedulelens.com/blog/what-is-an-mpp-file/</link><guid isPermaLink="true">https://schedulelens.com/blog/what-is-an-mpp-file/</guid><description>An MPP file is Microsoft Project&apos;s native plan file. What&apos;s inside it, how it differs from Project XML and XER, and what you can&apos;t tell until you open it.</description><pubDate>Thu, 08 Oct 2026 00:00:00 GMT</pubDate><category>Explainer</category><author>ScheduleLens</author></item><item><title>Asta Powerproject Schedule Review: How to Check a .pp Programme</title><link>https://schedulelens.com/blog/asta-powerproject-schedule-review/</link><guid isPermaLink="true">https://schedulelens.com/blog/asta-powerproject-schedule-review/</guid><description>How to review a contractor&apos;s Asta Powerproject programme: what a .pp file holds, the checks to run, and the progress and baseline traps in Powerproject.</description><pubDate>Fri, 25 Sep 2026 00:00:00 GMT</pubDate><category>How-To</category><author>ScheduleLens</author></item><item><title>The RICS AI Standard and Programme Review: Which Tools Count, and What You Must Record</title><link>https://schedulelens.com/blog/rics-ai-standard-programme-review/</link><guid isPermaLink="true">https://schedulelens.com/blog/rics-ai-standard-programme-review/</guid><description>Which scheduling and programme-review tools fall inside the RICS Responsible use of AI standard, how the material impact test works, and what you must record.</description><pubDate>Thu, 24 Sep 2026 00:00:00 GMT</pubDate><category>How-To</category><author>ScheduleLens</author></item><item><title>FIDIC Sub-Clause 8.3: The Eleven Things Your Programme Must Show</title><link>https://schedulelens.com/blog/fidic-programme-sub-clause-8-3/</link><guid isPermaLink="true">https://schedulelens.com/blog/fidic-programme-sub-clause-8-3/</guid><description>FIDIC 2017 Sub-Clause 8.3 lists eleven things a construction programme must show. Miss the 21-day review window and one nobody approved becomes binding.</description><pubDate>Mon, 07 Sep 2026 00:00:00 GMT</pubDate><category>Standards</category><author>ScheduleLens</author></item><item><title>What NEC4, FIDIC, JCT and the US Forms Actually Require of Your Programme</title><link>https://schedulelens.com/blog/contract-programme-requirements/</link><guid isPermaLink="true">https://schedulelens.com/blog/contract-programme-requirements/</guid><description>NEC4, FIDIC, JCT, AIA and the US federal specs demand completely different things of a construction programme. Two withhold payment. Three ask for nothing.</description><pubDate>Sun, 06 Sep 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Two Delay Analysis Methods, One Set of Facts, Opposite Answers</title><link>https://schedulelens.com/blog/delay-analysis-methods/</link><guid isPermaLink="true">https://schedulelens.com/blog/delay-analysis-methods/</guid><description>A worked construction example where two delay analysis methods invert which event caused the delay, plus what AACE, the SCL Protocol and CIOB require.</description><pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Prospective or Retrospective? What Four English Judgments Actually Say About Choosing a Delay Analysis</title><link>https://schedulelens.com/blog/prospective-vs-retrospective-delay-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/prospective-vs-retrospective-delay-analysis/</guid><description>What four English judgments say about choosing between prospective and retrospective delay analysis, and why the method label is not what a tribunal decides.</description><pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Primavera P6 Schedule Review: The Complete Checklist for Reviewing Contractor Schedules</title><link>https://schedulelens.com/blog/primavera-p6-schedule-review/</link><guid isPermaLink="true">https://schedulelens.com/blog/primavera-p6-schedule-review/</guid><description>A step-by-step Primavera P6 schedule review checklist: open XER files, run DCMA 14-Point checks, validate the critical path, compare updates, document findings.</description><pubDate>Fri, 03 Jul 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Schedule Analysis Tools and Software: Compared for Construction</title><link>https://schedulelens.com/blog/schedule-analysis-software/</link><guid isPermaLink="true">https://schedulelens.com/blog/schedule-analysis-software/</guid><description>Eleven schedule analysis and comparison tools for construction, compared on DCMA 14-point checks, update-to-update comparison, forensic delay analysis and EOTs.</description><pubDate>Fri, 03 Jul 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Schedule Manipulation Detection: How to Spot and Document Contractor Schedule Gaming</title><link>https://schedulelens.com/blog/schedule-manipulation-detection/</link><guid isPermaLink="true">https://schedulelens.com/blog/schedule-manipulation-detection/</guid><description>How to detect the 10 most common schedule manipulation techniques in construction, from hidden float to DCMA-threshold evasion, with step-by-step P6 methods.</description><pubDate>Fri, 03 Jul 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Schedule Analytics in Construction: Metrics, Methods, and Tools for Programme Intelligence</title><link>https://schedulelens.com/blog/schedule-analytics/</link><guid isPermaLink="true">https://schedulelens.com/blog/schedule-analytics/</guid><description>Schedule analytics turns programme data into project intelligence. Learn the metrics, tools, and methods construction PMs use to track and forecast performance.</description><pubDate>Wed, 01 Jul 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>How to Analyse Construction Schedule Quality: A Practical Workflow</title><link>https://schedulelens.com/blog/how-to-analyze-construction-schedule-quality/</link><guid isPermaLink="true">https://schedulelens.com/blog/how-to-analyze-construction-schedule-quality/</guid><description>Learn how to analyse construction schedule quality step by step: DCMA 14-point checks, logic audits, baseline validation and a client-ready reporting template.</description><pubDate>Mon, 01 Jun 2026 00:00:00 GMT</pubDate><category>Guide</category><author>ScheduleLens</author></item><item><title>Schedule Compression in Construction: How to Fast Track, Crash and Recover Delay</title><link>https://schedulelens.com/blog/schedule-compression/</link><guid isPermaLink="true">https://schedulelens.com/blog/schedule-compression/</guid><description>Schedule compression in construction: fast tracking vs crashing, cost slope analysis with worked examples, the 8-step process, and when not to compress.</description><pubDate>Wed, 27 May 2026 00:00:00 GMT</pubDate><category>Guide</category><author>ScheduleLens</author></item><item><title>Constructive Acceleration: How to Prove, Document and Defend Against Claims</title><link>https://schedulelens.com/blog/constructive-acceleration/</link><guid isPermaLink="true">https://schedulelens.com/blog/constructive-acceleration/</guid><description>How to prove constructive acceleration: the 5 elements of proof, schedule analysis methods, jurisdictional differences and documentation requirements.</description><pubDate>Mon, 25 May 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Delay Analysis Report: How to Write, Structure and Review Construction Delay Reports</title><link>https://schedulelens.com/blog/delay-analysis-report/</link><guid isPermaLink="true">https://schedulelens.com/blog/delay-analysis-report/</guid><description>Learn how to write a delay analysis report: 12-section template, SCL Protocol requirements, AACE 29R-03 disclosure, and how to review opposing reports.</description><pubDate>Fri, 22 May 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>MS Project Schedule Check: DCMA Quality Checklist for MSP</title><link>https://schedulelens.com/blog/ms-project-schedule-check/</link><guid isPermaLink="true">https://schedulelens.com/blog/ms-project-schedule-check/</guid><description>Step-by-step MS Project schedule quality checklist: how to check open ends, constraints, float, critical path, and run DCMA 14-Point in Microsoft Project.</description><pubDate>Wed, 20 May 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Schedule Risk Analysis: Monte Carlo, QSRA &amp; P80 Contingency in Construction</title><link>https://schedulelens.com/blog/schedule-risk-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/schedule-risk-analysis/</guid><description>Complete construction QSRA guide: Monte Carlo simulation, three-point estimates, P80 contingency planning, and step-by-step schedule risk analysis with P6.</description><pubDate>Mon, 18 May 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Forensic Schedule Analysis: The Construction Guide to AACE 29R-03 Methods, Process and Best Practice</title><link>https://schedulelens.com/blog/forensic-schedule-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/forensic-schedule-analysis/</guid><description>Forensic schedule and delay analysis for construction disputes: nine AACE 29R-03 methods, how to choose one, and each step from instruction to expert report.</description><pubDate>Sun, 10 May 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Time Impact Analysis (TIA): The Complete Step-by-Step Guide for Construction Delay Claims</title><link>https://schedulelens.com/blog/time-impact-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/time-impact-analysis/</guid><description>Time Impact Analysis (TIA) for construction delay claims: SCL Protocol method for fragnet construction, P6 walkthrough, common mistakes, review checklist.</description><pubDate>Sun, 10 May 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Baseline Schedule Review: A Step-by-Step Checklist for Contractor Programmes</title><link>https://schedulelens.com/blog/baseline-schedule-review/</link><guid isPermaLink="true">https://schedulelens.com/blog/baseline-schedule-review/</guid><description>Baseline schedule review checklist for construction PMs: contract compliance, logic, critical path, DCMA 14-Point quality checks, and monthly update reviews.</description><pubDate>Mon, 20 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Baseline vs Current Schedule Comparison: How to Identify and Interpret Schedule Variances</title><link>https://schedulelens.com/blog/baseline-vs-current-schedule-comparison/</link><guid isPermaLink="true">https://schedulelens.com/blog/baseline-vs-current-schedule-comparison/</guid><description>Compare baseline and current construction schedules: what changes to look for, how to run the comparison in P6, and what each variance means for your project.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Concurrent Delay in Construction: How to Identify, Analyse and Resolve It</title><link>https://schedulelens.com/blog/concurrent-delay/</link><guid isPermaLink="true">https://schedulelens.com/blog/concurrent-delay/</guid><description>Learn how to identify and analyse concurrent delay in construction: literal vs functional concurrency, the legal tests, and a step-by-step analysis method.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Construction Project Benchmarking: How to Validate Schedule Durations Against Industry Standards</title><link>https://schedulelens.com/blog/construction-project-benchmarking/</link><guid isPermaLink="true">https://schedulelens.com/blog/construction-project-benchmarking/</guid><description>Learn how to benchmark construction schedule durations against industry data. Covers methods, data sources, duration ranges by project type, and EOT claims.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Critical Path Method in Construction: How to Identify, Validate and Monitor the Critical Path</title><link>https://schedulelens.com/blog/critical-path-method-construction/</link><guid isPermaLink="true">https://schedulelens.com/blog/critical-path-method-construction/</guid><description>Learn how the critical path method works in construction, how to find and validate the critical path in P6, and why monitoring it prevents project delays.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>DCMA 14-Point Assessment: 14 Checks, Thresholds &amp; Fixes</title><link>https://schedulelens.com/blog/dcma-14-point-assessment/</link><guid isPermaLink="true">https://schedulelens.com/blog/dcma-14-point-assessment/</guid><description>The DCMA 14-point assessment as a checklist: every check, its pass/fail threshold, and how to fix the failures reviewers flag most on P6 and MS Project files.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Extension of Time (EOT) Claim Analysis: Methods, Preparation &amp; Review</title><link>https://schedulelens.com/blog/eot-claim-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/eot-claim-analysis/</guid><description>How EOT claims are proven and assessed: the six delay analysis methods, AS 4000, JCT and NEC4 time bars, and what a superintendent checks before granting time.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Extension of Time Claim Process: Step-by-Step Guide for Contractors and Employers</title><link>https://schedulelens.com/blog/extension-of-time-claim-process/</link><guid isPermaLink="true">https://schedulelens.com/blog/extension-of-time-claim-process/</guid><description>How to claim an extension of time: notice, records, delay analysis, submission and assessment, with the time bars under AS 4000, JCT, NEC4 and FIDIC 2017.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>How to Review a Contractor&apos;s Programme: Step-by-Step Guide with Checklist</title><link>https://schedulelens.com/blog/how-to-review-contractor-programme/</link><guid isPermaLink="true">https://schedulelens.com/blog/how-to-review-contractor-programme/</guid><description>The 7-step process for reviewing a contractor&apos;s baseline programme, from contractual compliance to schedule quality checks, with a practical review checklist.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Total Float vs Free Float in Construction Scheduling: What They Mean and How to Use Them</title><link>https://schedulelens.com/blog/total-float-vs-free-float/</link><guid isPermaLink="true">https://schedulelens.com/blog/total-float-vs-free-float/</guid><description>The difference between total float and free float in construction scheduling, how to calculate them, and what negative float tells you about project risk.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>XER File Analysis: How to Review P6 Schedules Without P6</title><link>https://schedulelens.com/blog/xer-file-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/xer-file-analysis/</guid><description>How to open and analyse a Primavera P6 XER file without a P6 licence: what it contains, what to check, and how to run a full DCMA 14-Point quality review.</description><pubDate>Fri, 17 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item><item><title>Construction Schedule Analysis: The Complete Guide to Methods, Steps &amp; Tools</title><link>https://schedulelens.com/blog/construction-schedule-analysis/</link><guid isPermaLink="true">https://schedulelens.com/blog/construction-schedule-analysis/</guid><description>A complete guide to construction schedule analysis: the four core methods, a 7-step contractor review process, EOT claims, and the best tools for the job.</description><pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate><category>Educational Guide</category><author>ScheduleLens</author></item></channel></rss>